DP World Solar Power Programme, Dubai

Building on Phanes Group’s distributed expertise, our team delivered the winning proposal among a high-profile tender to deliver Phase 1 of this project. Our challenge was to manage multiple sites simultaneously and coordinate with numerous stakeholders, all while the regulatory environment evolved around us. Capitalizing on our team's vast experience in distributed solar and integrated departments, we were able to successfully overcome these challenges and the first connections took place in early 2019, including the first solar PV MV rooftop connection in the UAE. The project serves as a model for future distributed solar developments under Dubai’s recently-launched “Shams Dubai” net-metering initiative.

Key Project Development Deliverables:

  • Project Screening; Energy Yield Simulation
  • Site Visits with Technical Assessment of Building Structures
  • CAPEX & OPEX Assessment
  • Preliminary Financial Modelling
  • Permitting (e.g. DEWA NOC, DEWA Final Approvals, Trakhees)
  • Construction
  • Operations & Maintenance
play

icon-charg.png

23.2MW

total capacity Phase I

icon-hand.png

25,000tons

estimated annual CO2 savings

icon-dp.png

88K PANELS

over 60+ rooftops